US 59 Upgrade - Cleveland (Future I-69), TxDOT
NLA was the public involvement lead on this US 59 upgrade project for the TxDOT Lufkin District. TxDOT proposed to upgrade existing US 59 by constructing frontage roads and overpasses from FM 2914 near Shepherd to the north end of the Cleveland Relief Route. The project was designed to meet interstate standards for possible future designation as I-69 and would: